Basic Description
This electrical power unit features a long term magnet motor with a electrical power up gravity down circuit. Activate the start off solenoid to begin the motor to lift the machine. The lowing motion is activated through the solenoid valve using the reducing velocity controlled from the stress compensated movement handle valve. Merchandise of this series might be broadly utilized in the industry of logistic devices this kind of as fork lift, mini lift table, and so on.
Distinctive Notes
one. This energy unit is of S3 duty cycle, i.e.,non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean every one of the hydraulic parts concerned just before installation of the electrical power unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst, which should really also be clean and totally free of impurities. N46 hydraulic oil is proposed.
4. This electrical power unit is built to be mounted vertically.
five. Check the oil degree while in the tank just after the 1st star from the electrical power unit.
6. Oil altering is required right after the original a hundred operation hours,afterwards as soon as each 3000 hrs.
7. More pump sizes and tank sizes are avaiable upon request.